PDC4S:\D\Digital Tutors (digitaltutors.com)\Digital Tutors - 'Infiltrator' Production Pipeline Volume 3 - Rigging

Up one directory...
NameSizeDate Modified
01. Introduction and Project Overview.flv8,412 KB8/2/2013 4:27 AM
02. Starting on the Proxy Mesh for the Infiltrator.flv70,045 KB8/2/2013 4:29 AM
03. Finishing the Proxy Cage.flv49,339 KB8/2/2013 4:28 AM
04. Beginning the Infiltrator rig and creating the middle leg's bones.flv50,430 KB8/2/2013 4:28 AM
05. Creating Joint Chains for the rest of the legs.flv63,748 KB8/2/2013 4:28 AM
06. Building joints for the arms.flv56,355 KB8/2/2013 4:28 AM
07. Connecting IK Handles to the limbs and Parenting the Proxy Meshes.flv65,764 KB8/2/2013 4:28 AM
08. Starting on the revolving leg rig.flv44,100 KB8/2/2013 4:27 AM
09. Working on the Infiltrator's body rig.flv14,454 KB8/2/2013 4:26 AM
10. Leg controls for the Infiltrator.flv51,594 KB8/2/2013 4:27 AM
11. Creating knee controls.flv75,350 KB8/2/2013 4:28 AM
12. Setting up the Infiltrator's arm and elbow controls.flv40,494 KB8/2/2013 4:27 AM
13. Using Custom Attributes for the claws.flv51,899 KB8/2/2013 4:27 AM
14. Dynamically Parenting the arms to the body.flv42,692 KB8/2/2013 4:26 AM
15. The Center of Gravity control.flv17,667 KB8/2/2013 4:26 AM
16. Creating controls for the revolving legs.flv41,327 KB8/2/2013 4:26 AM
17. Finishing the revolve controls for the legs.flv30,376 KB8/2/2013 4:26 AM
18. Establishing a revolve control for the Infiltrator's body.flv43,810 KB8/2/2013 4:26 AM
19. Rigging the head.flv85,031 KB8/2/2013 4:27 AM
20. Beginning the eye rig.flv51,986 KB8/2/2013 4:26 AM
21. Finalizing the eye rig.flv59,361 KB8/2/2013 4:26 AM
22. Rigging the neck.flv46,076 KB8/2/2013 4:25 AM
23. Using Deformers to rig the head flexor.flv49,575 KB8/2/2013 4:25 AM
24. Rigging the pistons connected to the back shells.flv55,569 KB8/2/2013 4:25 AM
25. Creating controls for the back shells.flv65,191 KB8/2/2013 4:25 AM
26. Completing the shell rig.flv57,672 KB8/2/2013 4:25 AM
27. Automating the movement of the front shells.flv41,817 KB8/2/2013 4:25 AM
28. Adding automated subtleties with Set Driven Keys.flv45,612 KB8/2/2013 4:25 AM
29. Finalizing the automation of the front shells.flv31,420 KB8/2/2013 4:24 AM
30. Building a Global Control and organizing the scene.flv50,247 KB8/2/2013 4:25 AM
31. Working with Character Sets.flv17,338 KB8/2/2013 4:24 AM
32. Tying the Render Mesh of the Infiltrator into the control rig.flv67,218 KB8/2/2013 4:25 AM
33. Finalizing the Infiltrator control rig.flv73,387 KB8/2/2013 4:25 AM